
Former Anaconda Wire & Cable on the Hastings-on-Hudson Waterfront
Photo by Scott Rosasco
Portions of the remediation will include a new sheet pile bulkhead at the northwest corner of the property, creating almost 1 acre (.88 acre) of new land for the purpose of the containment and recovery of liquid PCBs. Sediments will also be dredged from the Hudson riverbed, extending up to 80′ offshore of the site, to a depth of 6′, including the former marina area. The expectations are to remove tens of thousands of cubic yards of contaminated river sediments and land soils, including the PCB and heavy metal contamination.
This decision follows on the heels of a recent meeting to begin to address a similar, although perhaps less severe, contamination issue at the former GM site in Sleepy Hollow NY, also on the Hudson River, approximately 6 miles to the north of Hastings.
With any hope, the collaborative combination of these efforts will help the Westchester Hudson riverfront to live up to the incredible potential it has for scenic beauty, waterfront uses, development and as a great natural recreational resource.
Read the full news release here: http://www.dec.ny.gov/press/82111.html
Filed under: Local News, Real Estate | Tagged: Anaconda Wire, Cleanup, DEC, Harbor, Hastings-on-Hudson, Hudson, PCB, Remediation, Riverkeeper, Scott Rosasco |
Leave a Reply